BART cuts Transbay Tube service to one track Saturday night | The Locally Times

Published ยท The Locally Times

Yes, BART will reduce Transbay Tube service to one track Saturday night for lighting work, running trains every 30 minutes.

BART crews will replace lights in the Transbay Tube starting Saturday, September 19 at 10pm and continue through the end of service that night. The work will reduce normal service from two tracks to one, with trains running every 30 minutes systemwide. Only the Blue, Yellow, and Orange lines will operate; Red and Green Line service will not run. A Yellow Line shuttle will run between SFO and Millbrae all day, and passengers traveling beyond SFO must transfer. Similar lighting work is scheduled for Saturday, November 21 from 10pm through close of service and all day Sunday, December 6. Crews performed comparable work on three previous Sundays in April, June, and July. BART's Trip Planner will be updated to reflect schedule changes for these days, and riders are encouraged to plan trips in advance.