BCTA Cuts Route 3 From Mall for 7 Months, Shifts to Vanport | The Locally Times

Starting March 28, 2026, the BCTA's Route 3 began bypassing Beaver Valley Mall for over seven months due to unspecified construction, shifting all service to Vanport and impacting daily commutes.

Beaver Valley Mall is now entirely cut off from Route 3 bus service, a disruption that began March 28, 2026, and will last over seven months. The Beaver Valley Transit Authority (BCTA) announced this major service change, which shifts all Route 3 trips to Vanport, in a March 28, 2026, meeting record. The rerouting is in effect until October 31, 2026, significantly altering a key transit connection for many residents and forcing commuters and shoppers to find new ways to reach the mall. ## Mall Cut Off: Route 3 Bypasses for Seven Months The BCTA's Route 3 bus service began bypassing Beaver Valley Mall on March 28, 2026, a rerouting that will continue until October 31, 2026. This substantial change, detailed in a March 28, 2026, BCTA meeting record, means passengers have been unable to board or disembark Route 3 directly at the mall since the disruption began. The transit authority attributes the change to construction, but its public record does not specify the project's nature or scope. This marks a significant disruption to a major community access point, requiring commuters and shoppers to make alternative travel arrangements. ## Vanport Becomes New Route 3 Hub, Transfers Required for Mall With Route 3 bypassing the mall, all trips have shifted to originate or terminate in Vanport, making it the temporary hub for the line. While the BCTA's March 28, 2026, record confirms this shift, it does not specify the exact locations within Vanport where buses start or end their routes, leaving riders to plan connections without full details. For those needing to reach Beaver Valley Mall, the BCTA advises using Route 2. This alternative means riders must either transfer from Route 3 or plan their entire journey via Route 2, potentially adding time and complexity to their commutes. This shift represents a notable change in service for a key regional route. ## Construction Details Scarce, Riders Face Major Adjustments The BCTA's decision to reroute Route 3 for over seven months due to construction demands significant adjustments from Beaver Valley commuters and shoppers. The March 28, 2026, BCTA record cites construction as the reason but offers no specifics on the project's scope, necessity, or why it requires such an extended route impact. This lack of transparency leaves the public without key information. Furthermore, the BCTA record includes no projected impact assessments on ridership, such as potential increases on Route 2 or changes in overall Route 3 passenger volume. Residents relying on public transit for work, appointments, or shopping at the mall must now adapt their travel plans, either transferring to Route 2 or completely rethinking their transportation. The BCTA record provides no information on mitigation efforts or public outreach beyond the initial announcement. ## Key Questions **Which bus route is affected by the rerouting?** The Beaver Valley Transit Authority's Route 3 is currently rerouted. **How long will the rerouting last?** The rerouting is in effect from March 28, 2026, to October 31, 2026, a period of over seven months. **How can I still get to the Beaver Valley Mall?** Riders can access the Beaver Valley Mall using the BCTA's Route 2 during the rerouting period.